Top 5 NSPIRE Inspection Failures
These issues cause 80% of inspection failures. Learn what they are and how to prevent them.
NSPIRE Severity Levels & Deadlines
Life-Threatening
24-hour deadline
Severe
30-day deadline
Moderate
60-day deadline
The Top 5 Failure Points
24 hours
Missing, non-functional, or improperly placed smoke detectors.
How to Prevent This:
- Test all smoke detectors monthly
- Replace batteries every 6 months
- Install detectors in every bedroom and common area
- Replace units older than 10 years
24 hours - 30 days
Exposed wiring, missing outlet covers, overloaded circuits, or non-functional GFCI.
How to Prevent This:
- Replace damaged outlet and switch covers
- Test GFCI outlets monthly
- Never use extension cords as permanent wiring
- Have electrician inspect panel annually
30 days
Leaking faucets, running toilets, water damage, or inadequate hot water.
How to Prevent This:
- Check under all sinks monthly
- Repair dripping faucets immediately
- Maintain water heater properly
- Address water stains promptly
30 days
Entry doors without deadbolts, broken window locks, or non-securing doors.
How to Prevent This:
- Install deadbolts on all entry doors
- Test all locks quarterly
- Replace broken window locks
- Ensure doors close and latch properly
30-60 days
Non-functional heating/cooling, dirty filters, or inadequate ventilation.
How to Prevent This:
- Service HVAC systems annually
- Change filters every 1-3 months
- Test heating before winter inspections
- Ensure bathroom fans work
What Happens If You Fail?
Understanding the consequences helps you prioritize prevention
- 24-hour deadline to fix the issue
- HAP payments may be immediately suspended
- Tenant may need to be temporarily relocated
- Re-inspection required within 24 hours
- 30-60 day deadline depending on severity
- Must document repair completion
- Re-inspection may be required
- Multiple failures may trigger enhanced oversight
How PropertyLedger Helps
220+ Deficiency Types
Complete database of all NSPIRE deficiencies with severity levels and deadlines.
Deadline Tracking
Automatic reminders before 24-hour, 30-day, and 60-day deadlines.
Auto Work Orders
Deficiencies automatically generate work orders with priority levels.
Frequently Asked Questions
What is the most common reason for NSPIRE inspection failure?
Smoke detector issues are the #1 cause of NSPIRE failures. Missing, non-functional, or improperly placed smoke detectors are flagged as Life-Threatening deficiencies with a 24-hour remediation deadline.
What happens if I fail an NSPIRE inspection?
For Life-Threatening deficiencies, you have 24 hours to fix the issue. Severe deficiencies require 30-day remediation, and Moderate deficiencies allow 60 days. Failure to remediate can result in HAP payment suspension.
Can I request a re-inspection after fixing issues?
Yes. After fixing deficiencies, you can schedule a re-inspection to verify repairs. Document all repairs with photos and receipts. PropertyLedger helps you track this process automatically.
How can I avoid NSPIRE inspection failures?
Conduct regular pre-inspections using our NSPIRE checklist, address maintenance issues promptly, and use PropertyLedger to track all 220+ deficiency types with automated deadline reminders.
Don't Risk Inspection Failure
PropertyLedger tracks all 220+ NSPIRE deficiency types with automatic work orders and deadline reminders. Stay compliant without the stress.
Start Free Trial14-day free trial • No credit card required